We have come a long way in just 10 days of getting our "Transition home transitioned"! All the yellow highlighted items need to be completed for the home to be ready to move in. Everything else is cosmetic that can be completed as money and time allows. Jake is focusing mainly on Flooring and handyman fixes and installations. I am focusing on the cleaning and painting. We help each other out as need as well.
Last night was fun. My sister took B to Big Lots.. it's their special place to go together. Jake and I had a lot of fun and got a lot of work done in just a few hours. He did the kids bathroom floor and installed the toilet. I prepped the walls in his office for painting and was his helper while moving one toilet from one side of the house to the other. Helping, as in, following him with a rag to catch the drips... This is where you say ew! (we are switching the toilets to have the nicer one in the hallway bath.
B’s Room Tear out old floor
Staples out of floor
Patch walls
Prep walls
Paint
Lay carpet
Kids Bath
Gut
Put in new sub floor
New Floor
Install toilet
Floor to ceiling white wainscoting Paneling (great idea Dad in law!!!)
New vanity
New tub fixtures
Towel racks
Storage shelf over toilet
Master Bedroom
Tear out old floor
Staples out of floor
Patch Walls
Prep Walls
Paint
New floor
Master Bath
Gut
Put in new sub floor
Prep walls
Paint
New Floor
Install toilet
New vanity or Pedestal sink
New tub fixtures
Fix tub caulking (worst caulk job we've ever seen!)
New shower curtain
Living Room and Hallway
Gut
Staples out of floorPatch Walls
Prep Walls
Paint
Kitchen
Clean everything
Contact Paper on Shelves
Windows
Replace screens
Wash windows
Sew curtains
Curtain rods
Put up shades
Doors
Replace front screen door
Paint door frame
Paint front door white
Light Fixtures
New throughout inside and out
Exterior outlet thing
Outside
Trim hedges
Weed Whack
Fall Landscaping
Staples out of floor
Patch walls
Prep walls
Paint
Lay carpet
Kids Bath
Gut
Put in new sub floor
New Floor
Install toilet
Floor to ceiling white wainscoting Paneling (great idea Dad in law!!!)
New vanity
New tub fixtures
Towel racks
Storage shelf over toilet
Master Bedroom
Tear out old floor
Staples out of floor
Patch Walls
Prep Walls
Paint
New floor
Master Bath
Gut
Put in new sub floor
Prep walls
Paint
New Floor
Install toilet
New vanity or Pedestal sink
New tub fixtures
Fix tub caulking (worst caulk job we've ever seen!)
New shower curtain
Living Room and Hallway
Gut
Staples out of floorPatch Walls
Prep Walls
Paint
Kitchen
Clean everything
Contact Paper on Shelves
Windows
Replace screens
Wash windows
Sew curtains
Curtain rods
Put up shades
Doors
Replace front screen door
Paint door frame
Paint front door white
Light Fixtures
New throughout inside and out
Exterior outlet thing
Outside
Trim hedges
Weed Whack
Fall Landscaping
Other
All carpets cleaned
All trash removed
No comments:
Post a Comment
Please comment so I can connect with you! Especially if you are a Michigan farming housewife! I have a lot to learn from you!